FEATURED PROJECTS
Calgary International Airport
CALGARY, AB
The fourth busiest airport in Canada, the YYC terminal includes dual skin façade with active louvres, motorized horizontal blinds and operable windows integrated with solar tracking sensors.
Ryan Fieldhouse and Walter Athletics Center
EVANSTON, IL
The 4-storey Walter Athletics Center houses academic and professional development support services for more than 500 student-athletes.
Mohawk College - The Joyce Centre For Partnership & Innovation
HAMILTON, ON
This is the first institutional building to earn a Zero Carbon Building – Design certification through the CaGBC’s Zero Carbon Building Program.
The Cairns Family Health and Bioscience Research Complex
ST. CATHARINES, ON
The CFHBRC is a 4-storey, 169,000 sq. ft. facility that opened in 2012 and featured new laboratories, research facilities, and office space.
New Oakville
Trafalgar Memorial Hospital
OAKVILLE, ON
This 1.5-million sq. ft. hospital opened in 2015 and offers a thorough range of primary and secondary care services.
University of Michigan Ross School of Business - Kresge Hall and Jeff T. Blau Hall
ANN ARBOR, MI
This 179,000 sq. ft. building includes state-of-the-art classrooms, student collaboration and study spaces, offices, and a redesigned digital library.
Eau Claire Tower
CALGARY, AB
The 25-storey tower is connected to Calgary's +15 network for rapid, year-round access to dozens of office and retail destinations and is targeted to be a LEED® Gold certified.
Halifax Central Library
HALIFAX, NS
The HCL won CNN's Top Ten "eye popping" buildings of 2014. It achieved LEED Gold in 2016.
707 Fifth
CALGARY, AB
This LEED Gold certified building has full-height, clear, triple pane, structurally glazed, aluminum curtain wall.
St. John Health
Providence Park Hospital
ANN ARBOR, MI
This 7-storey, 500,000 sq. ft. hospital opened in 2009 and includes a beautiful 6-storey natural light atrium.
Edmonton Tower
EDMONTON, AB
This 29-storey office building achieved LEED® Gold and incorporates curtain wall, spandrel panels, marble, granite and accented features.
Vassar Brothers Medical
Center Patient Pavilion
POUGHKEEPSIE, NY
This unique 7-storey building follows the shape of the Hudson River and is a 696,000 sq. ft. patient pavilion. It is expected to open in late 2020.
Humber River Hospital
TORONTO, ON
The HRH is a 1.8 million sq. ft. facility that opened in 2015 and is North America's first fully digital hospital.
Simpson Querrey
Biomedical Research Center
CHICAGO, IL
Located on Northwestern University’s Chicago campus, this medical research building will focus on areas such as pediatrics, cancer, heart disease, neurodegenerative disorders and genetics.
University of Chicago - Campus North Residential Commons
CHICAGO, IL
Open in 2016, the Campus North has a mix of student residences, dining options, retail, and outdoor spaces.
University of Calgary - EEEL (Energy,Environmental, Experential Learning)
CALGARY, AB
EEL achieved LEED Platinum certification and includes earth tubes that heat and cool the main theatre radiant floor and ceiling systems, and a high-performance envelope with triple glazing.
Palliser South
CALGARY, AB
This 19-storey, AA class office building, is 301,000 sq. ft. and achieved LEED® certification in 2017.
University of Waterloo - E7
WATERLOO, ON
E7 is a 7-storey, 242,000 sq. ft. building that houses some of the best research facilities in the world.
60 Standish Court
MISSISSAUGA, ON
This 6-storey office building consists of two towers linked by a 3-storey podium with an approximate total area of 362,177 sq. ft. and achieved LEED Silver.